Piling to Ground Floor Slab T2 Car Park Dublin Airport
Rapid Construction of T2 Precast Car Park in Dublin Airport required construction of the ground floor slab after the main structure was complete. A grid of helical piles 4 - 6m deep was placed under the slab where there was a concern about the bearing capacity of filled ground. 195 piles were placed in 6 days including 2 static tests.
October 2012
80000
Completing on time and for tender sum
Bowen Construction Ltd
O’Connor Sutton Cronin
Michael Allen 086 2355275 (ex Director BCL)
Roger Taggart (OCSC)
Carparks